Estimated cost

PKR 1.69 Crore

PKR 5,000 per Sq. Ft. · 3,375 Sq. Ft. covered

Grey structure materials
PKR 81 Lakh
Finishing materials
PKR 59.06 Lakh
Labour
PKR 28.69 Lakh

A guide for planning, not a quote. Rates last updated 3 November 2026.

Where the money goes

A typical split, which your design and materials will change

Foundation and structure
PKR 84.81 Lakh · 50.3%
Wood, metal and tile works
PKR 52.06 Lakh · 30.9%
Electrical works
PKR 15.8 Lakh · 9.4%
Plumbing works
PKR 9.59 Lakh · 5.7%
Fittings and fixtures
PKR 6.5 Lakh · 3.9%

Foundation and structure

PKR 84.81 Lakh

The basic house: foundation, floors, walls, roofing and plastering.

  • Bricks, cement, sand and crush 53.06 Lakh
  • Labour cost 15.96 Lakh
  • Excavation and steel reinforcement 14.58 Lakh
  • Roof insulation, termite and water proofing 1.22 Lakh

Wood, metal and tile works

PKR 52.06 Lakh

Flooring, cabinets, wardrobes, windows and all metal work.

  • Tile work 21.26 Lakh
  • Labour cost 10.13 Lakh
  • Paint and ceiling works 9.45 Lakh
  • Wardrobes and cabinets 5.91 Lakh
  • Metal works 2.95 Lakh
  • Windows 2.36 Lakh

Electrical works

PKR 15.8 Lakh

Underground wiring and all electrical items.

Grey structure 5.16 Lakh · Finishing 10.63 Lakh

  • Wires and cables 5.91 Lakh
  • Switches and back boxes 3.8 Lakh
  • Lights, fans and chandeliers 2.95 Lakh
  • Conduits and accessories 2.03 Lakh
  • Labour cost 1.11 Lakh

Plumbing works

PKR 9.59 Lakh

Underground piping, water supply and drainage.

  • Pumps and drains 3.24 Lakh
  • Labour cost 1.49 Lakh
  • Drainage system piping 1.22 Lakh
  • Gas piping 1.22 Lakh
  • Cold and hot water supply 81,000
  • UPVC pipeline for sewerage system 81,000
  • AC drainage system 41,000
  • Insulation Armaflex 41,000

Fittings and fixtures

PKR 6.5 Lakh

Kitchen and bathroom accessories.

  • Bathroom 5.32 Lakh
  • Kitchen 59,000
  • Geyser and manhole 59,000
Foundation and structure
PKR 84.81 Lakh · 85.2%
Plumbing works
PKR 9.59 Lakh · 9.6%
Electrical works
PKR 5.16 Lakh · 5.2%

Foundation and structure

PKR 84.81 Lakh

The basic house: foundation, floors, walls, roofing and plastering.

  • Bricks, cement, sand and crush 53.06 Lakh
  • Labour cost 15.96 Lakh
  • Excavation and steel reinforcement 14.58 Lakh
  • Roof insulation, termite and water proofing 1.22 Lakh

Plumbing works

PKR 9.59 Lakh

Underground piping, water supply and drainage.

  • Pumps and drains 3.24 Lakh
  • Labour cost 1.49 Lakh
  • Drainage system piping 1.22 Lakh
  • Gas piping 1.22 Lakh
  • Cold and hot water supply 81,000
  • UPVC pipeline for sewerage system 81,000
  • AC drainage system 41,000
  • Insulation Armaflex 41,000

Electrical works

PKR 5.16 Lakh

Underground wiring and all electrical items.

  • Conduits and accessories 2.03 Lakh
  • Switches and back boxes 2.03 Lakh
  • Labour cost 1.11 Lakh
Wood, metal and tile works
PKR 52.06 Lakh · 75.2%
Electrical works
PKR 10.63 Lakh · 15.4%
Fittings and fixtures
PKR 6.5 Lakh · 9.4%

Wood, metal and tile works

PKR 52.06 Lakh

Flooring, cabinets, wardrobes, windows and all metal work.

  • Tile work 21.26 Lakh
  • Labour cost 10.13 Lakh
  • Paint and ceiling works 9.45 Lakh
  • Wardrobes and cabinets 5.91 Lakh
  • Metal works 2.95 Lakh
  • Windows 2.36 Lakh

Electrical works

PKR 10.63 Lakh

Underground wiring and all electrical items.

  • Wires and cables 5.91 Lakh
  • Lights, fans and chandeliers 2.95 Lakh
  • Switches and back boxes 1.77 Lakh

Fittings and fixtures

PKR 6.5 Lakh

Kitchen and bathroom accessories.

  • Bathroom 5.32 Lakh
  • Kitchen 59,000
  • Geyser and manhole 59,000
Share this estimate
Link copied

Popular sizes

Double storey, at standard quality, with material

Questions about building costs

What is included in a grey structure?

The basic build: foundation, columns, beams, roof, walls, plaster, and the pipes and conduits inside them. It leaves out tiles, paint, doors, kitchens, bathrooms, lights and other finishes.

What is covered area?

The total floor space you build across all floors, including the walls, as opposed to the plot size. Costs follow covered area, which is why a two-storey house costs about twice a one-storey one on the same plot. We assume a usual figure, which you can change to match your plan.

With material or without material?

With material, the contractor supplies everything and the estimate covers materials and labour. Without material, you buy the materials yourself and the estimate covers labour only, so you still need to budget for materials.

How accurate is this?

It is a guide for planning, not a quote. Your design, soil, basements, boundary walls, material prices and the contractor all move the real cost. For a real budget, get a detailed estimate from a contractor.

How do the rooms change the cost?

We start from the rooms a house of that size usually has, which the rates already allow for. One more or fewer changes the items it touches: another bathroom adds its fittings, walls, a window and lighting, while another kitchen adds cabinets too. Plumbing, wiring and tiles here follow the covered area instead.

What does it leave out?

The plot itself, approval and design fees, a basement, boundary walls, solar, air conditioners and furniture, unless your contractor includes them.

Where do the rates come from?

Our team sets them and updates them as the market moves, for Islamabad and Rawalpindi. Costs can differ elsewhere. The date beside the result shows when they last changed.